Home  |  Site index Français  |  English
formation

Establishment of a Local Telecommunications Network

Description:

Our commercial telecommunications networks, industrial and residential are becoming more efficient and faster and their complexity increases. Therefore, electromagnetic fields have an increasingly important interaction with our structured cabling installations. There is evidence that many of the problems related to structured cabling and performance issues of computer networks and telephone today are often due to absent or non-compliant establishment.

This course has been established to promote understanding of problems related to inadequate establishment aswell as the latest techniques developed to stop these deficient practices. Using various publications put at our disposal such as the electrical code of Quebec, the ANSI TIA / EIA 607 as well as some recommendations of books and organizations such as BICSI, the student will learn about the laws which will be applied to all structured cabling networks.

Target audience:

Network users, electricians, network administrators

Learning objective:

1. Interpreting the data plan and an estimate for the MALT (Grounding).
2. Recognize the features and accessories associated to earthing.
3. Differentiating the normalization that applies to networks of MALT in order to support a structured cabling system.
4. Understanding the technical implementation and installation to become familiar with the acquisition of land.
5. Understanding the basic principles of the generation of electrostatic and electromagnetic discharge.
6. Knowing the technical setup and verification in order to ensure a proper grounding, according to standards.
7. Validate the quality of facilities using measuring instruments.

Course duration: 3 Days

Course content:

Basic principles study
- Electrical protection device and earthing
- Systems protection, linking and earthing
- Electromagnetic and electrostatic interference sources identification
- Separation of electrical circuits and telecommunication cables
- Verification of an earthing network
- Methods of using a voltmeter, a Megger, the practice of grounding in telecommunications and practical connection with the use of TMGB, TGB, TBB, etc..
- Impacts of inadequate earthing
- Practices related to passive systems, switches and switches computer, telephone and video
- Principle of aluminothermic
- The introduction, recommendations review and legislation
- Safety and prevention
- Protectors technologies, equipment earthing, protective devices for telecommunication including arresters.
- Applicable standards
Review standards
- National Building Code of Canada
- Electrical Code of Quebec
- ANSI TIA / EIA 607
- BICSI
Lab and Demonstration
- Acquisition of land, natural and artificial
- Earthing of telecommunication equipment
- Earthing preparation and installation
- Earthing : Routing and cables attachment
- Welding Aluminothermic (Cadweld)
- Check the tension, continuity and impedance on the ground conductor
- Verification of the resistivity of the earth using a Megger earth, selective measures
- Administration and identification of a network of grounding, the minutes report, certification
- Blueprint Reading

Note:

Students learn to apply the basic principles of establishment with practical workshops and demonstrations.

Our Clients

  

Resource Center

Spear-phishing stats reveal unexplained holiday spikes

While phishing attempts against workplace email accounts drop...

New banking cyber attack even penetrates accounts protected with latest PIN secu

A new generation of cyber attack has evolved to 'leapfrog' the latest generation of security - including PIN...

Newsletter